Lyon, travaux au canal de Jonage: Machine à damer

1897 1min

A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.

Storyline

A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.

Released
May 19, 1897
Runtime
1min
Language
French
Production
Lumière