Furnace Builders
At the Eisenhüttenkombinat Ost an der Oder, a new blast furnace is being moved to replace a burnt-out one. 2000 tons have to be moved 18 meters: Three times we hear it in the commentary. Master Klaus is now in command. His orders are to be obeyed at all costs. Men at work: tense faces, examining hands, the sound of screeching winds and steel cables stretched to breaking point. Everything is going well, and it is a new best performance: The downtime of the plant has been reduced from 80 to 40 days, the commentary says.
Storyline
At the Eisenhüttenkombinat Ost an der Oder, a new blast furnace is being moved to replace a burnt-out one. 2000 tons have to be moved 18 meters: Three times we hear it in the commentary. Master Klaus is now in command. His orders are to be obeyed at all costs. Men at work: tense faces, examining hands, the sound of screeching winds and steel cables stretched to breaking point. Everything is going well, and it is a new best performance: The downtime of the plant has been reduced from 80 to 40 days, the commentary says.
Inside Asda: Bigger, Better, Cheaper?
6.5Return
6.6Lupin the Third: Operation: Return the Treasure
6.8Return
6.6RETURN
6.9Transformers: Titans Return
6.9Return to Horror Hotel
6.6UFC 21: Return Of The Champions
6.8GCW: Fight Club Houston
7.5The Three Friends
6.2Bonanza: The Return
6.5John
7.6The Return
6.7The Rat Tamer
6.0DEAD RADIO
8.0NO STEP
6.5L.E.T.H.A.L. Ladies: Return to Savage Beach
6.1Fight Club
6.5Return
6.7